Posted on

M113 M74C & T50 Turrets Assembly

 

a. 1x M113 Driver head sprue.
b. 2x M113 T50 turrets.
c. 2x M113 T50 main guns.
d.
2x M113 T50 turret hatches.
e. 2x M113 M74C turrets.
f. 2x M114 M74C hatches.
g. 4x Vehicle commander figures.
Assembling The M113 T50 Turret
Step 1. Attach the main gun to the front of the turret ensuring that the shorter .30 cal MG is on the right-hand side. Step 2. Next, attach the hatch to the top of the turret.
Tip: When referring to left or right-hand side in regards to a Flames Of War miniature, the orientation is determined as if looking at the vehicle from the rear.
M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243)
Below: The hatch attached to the turret. Step 3. The T50 turret simply replaces the weapons turret of the stock M113.

Learn more to assembly the M113 here…

Below: The fully assembled M1113 complete with T50 turret.
M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243)
Adding A Vehicle Commander
Step 1.Attach the hatch in an open position. Step 2. Add the vehicle commander into the open hatch. Below: The M113 with T50 turret fully assembled complete with vehicle commander.
M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243)
Assembling The M113 M74C Turret
Step 1. Attach the M74C turret hatch to the rear of the turret. Step 2. The M74C turret simply replaces the weapons turret of the stock M113.

Learn more to assembly the M113 here…

Below: The fully assembled M1113 complete with M74C turret.
M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243)
Adding A Vehicle Commander
Step 1.Attach the hatch in an open position. Step 2. Add the vehicle commander into the open hatch. Below: The M113 with M74C0 turret fully assembled complete with vehicle commander.
M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243) M113 M74C & T50 Turrets (VAN243)
Posted on

M113 FSV Turret Assembly

 

Step 1. Begin by attaching the FSV deck to the hull of the M113.

Learn how to assembly the M113 here…

Step 2. Attach the driver’s hatch to the FSV deck.
M113 FSV Turret (VAN242) M113 FSV Turret (VAN242) M113 FSV Turret (VAN242)
Below: The driver’s hatch attached to the FSV deck. Below: The M113 FSV hull fully assembled. Step 3. Next, attach the main gun to the front of the turret.
M113 FSV Turret (VAN242) M113 FSV Turret (VAN242) M113 FSV Turret (VAN242)
Below: The main gun attached to the turret. Step 4. Next, attach the hatches to the top of the turret.
M113 FSV Turret (VAN242) M113 FSV Turret (VAN242) M113 FSV Turret (VAN242)
Below: Adding the hatches to the top of the turret. Below: The fully assembled M113 FSV.
M113 FSV Turret (VAN242) M113 FSV Turret (VAN242) M113 FSV Turret (VAN242)
Adding A Vehicle Commander

Step 1.Attach the hatch in an open position.

Step 2. Add the vehicle commander into the open hatch. Below: The M113 FSV fully assembled complete with vehicle commander.
M113 FSV Turret (VAN242) M113 FSV Turret (VAN242) M113 FSV Turret (VAN242) M113 FSV Turret (VAN242)